Technip MH cut costs by 41%, raised engineering productivity by 37% and reduced absenteeism by 20% through a Directive Communication Psychology culture program. Results verified by CEO Maarten Spilker.
The numbers
- 41% cost reduction
- 37% engineering productivity increase
- 20% absenteeism reduction
- Verified by: Maarten Spilker, CEO
The situation
The biggest of the issues was the missing of deadlines for 100 million dollar projects and this affected credibility which alsoaffectedthe bottom line.
What was done
- Measured the real culture. Leadership and engineering teams were profiled with Colored Brain and a culture benchmark was set, so the before and after could be compared honestly.
- Found the root cause. The gap between what leaders said they valued and what the environment rewarded. Engineers were being paid to be careful, and careful looked like slow.
- Reverse engineered the objectives into behaviours. A small set of behaviours that, done consistently, would move cost and throughput.
- Made the behaviours visible. Recognition and team progress in the open, with the No Blame Zone making it safe to flag problems early.
- Re-measured. The numbers above are the delta against the benchmark.
Why it held
The capability stayed in the company. Internal leaders were certified in the method rather than renting a consultant indefinitely, which is the same model offered to every client through the DC Psychology certification.
Want the same measurement on your organization?
Book a 20 minute culture call or start with the free AI Culture Pulse.